| 1. | The study of ip start control for 300mw turbine system 机组中压缸启动控制研究 |
| 2. | Pid control in adjustable - pitch wind turbine system based on bp neural network 变桨距风电机组控制 |
| 3. | Compositive technology and design fundamental of steam turbine system in igcc 中蒸汽系统的集成技术与设计原则 |
| 4. | Adjustment strategy and performance analysis of gas turbine system when burning medium and low heat value fuel 燃烧中低热值燃料时燃气轮机系统的应对方案及其性能分析 |
| 5. | Technical specification of design condition for monitor and control of boiler and turbine system in chemical industry 化工企业锅炉装置及汽轮机组热工监测与控制设计条件 |
| 6. | It can be easily used in different steam turbine system , by the visual configuration , the input and output management 通过软件测试,特别是在实际机组中的应用,证明了该软件的正确性和可用性。 |
| 7. | The steam turbine system and the boiler system construct respectively an integral linear 0 - 1 problem and a non - linear problem 汽轮机系统和锅炉系统分别构成线性混合0 - 1整数规划问题和非线性规划问题。 |
| 8. | For more information about industrial gas turbines , gas turbine systems or power engines please call the company turbomach gmbh Turbomach gmbh是一家高级别的大型贸易商,提供多方面的、高质量的燃气轮机装置,工业煤气涡轮(机) ,动力机。 |
| 9. | The paper employs the method of three stage design to make analysis on the pneumatic turbine system of the mine pneumatic pump in theory and put it into experiment on the base of the kfb30 - 18 mine pneumatic pump 本课题采用三次设计方法,以kfb30 - 18型矿用风动水泵为基础,对该产品的风动涡轮系统进行了理论分析和实验研究。 |